Hello Eduardo,
When we talk about labor costs , I think the above option would be challenging just because we can't enter a fixed costs for the SC material . I think it depends on the volume of incoming SC material and the actual time spent on inspecting it which will help to arrive at close to approximate costs. In the above suggestion are you recommending to maintain the condition types with a control record ?
Secondly, since the SC material as BOM , can anyone let me know if I can link it to the routing. If so how?<Text removed by Moderator>.
Thanks
Sri.
Message was edited by: Jyoti Prakash - As per SCN RoE, you are not suppose to ask step by step process or documentation. Please help yourself.