Dear all,
I'm trying to modify one of the existing workflow (custom) . The requirement is I need the below two steps inside the loop and need to send the task (Material Problem for GR for PO) for every 3 days till some one acts upon the task. Can anyone let me know how I have to design this?
Thank you,
Justin.