Hi all ,
In production order there are 5 operations are there
In routing there is no any material assignment for each operation.
Totally 2 components are there.
While creating the production order system is picking the component assignment only for the 1st operation
For the remaining operation system is not allocated the component
My scenario is the two component is should flow in all the operations