Hi Abu,
You may try QE51 and I hope it will work also for your scenario. As Mr. Anand told that is really required.
In QE51 Screen put:
- Material, plant and Insp.Type
- Tick mark " with long-term inspections (at worklist selection area)
- Execute it/F8
You will see the list of lots, select that lot and double click on Inspection char (Long Term MIC) and put/change the value and save it.
Hope it will help you.
Let me correct myself here.!!!
We can only enter the value in Long term planning Inspection if the lot status is LTIN. Just leave these MIC blank or put initial value and do not close/force close (status 5) while doing RR. Also do not set the indicator of long term Insp. plan MIC indicator "Optional character" otherwise status will change to ICCO after UD.
When the status of lot is LTIN, we can easily enter the results using QE01, QA32 etc.
Regards;
S Ahmed
Message was edited by: Sarfaraz Ahmed